Small Shelter Systems (SSS) Course
1.)Electrical System troubleshooting is straightforward and takes a ____ approach
-Systematic
2.) Included in the container is a ____ to connect the shelter distribution box to an external power source.
-50-foot extension cord
3.) When assembling the base frame, the two green color-coded end bases are positioned ____ in the frame.
-diagonally
4.) Top cover contour ropes are tied to the ___ tie-off cleats
-red
5.) What must be done first before beginning disassembly of the electrical system?
-Remove Primary Power
6.) The door-header is fitted into the uprights on the ___.
-hard door end panel
7.) How many pull ropes are required to install the top cover over the arches?
-4
8.) Top cover base ropes are tied to the ___ tie off cleats
-silver
9.) Before erecting the SSS, choose a site at least ___ in size.
-35 by 50 feet
10.) What part of the door is inserted into the base frame?
-metal pin
11.) Guy rope rings should be positioned midway between each arch. (T/F)
-False
12.) The end-panel base rope is secured to what color tie off cleat?
-Yellow color coded tie off
13.) The base assembly should be the same distance diagonally from each other. (T/F)
-True
14.) The three red purlins are installed____
-on the same end of the shelter
15.) Maintain distance between light fixtures at ____
-10 ft
16.) The SSS comes with ___ light fixtures.
-six
17.) What would you do if the electrical cables become nicked or frayed excessively?
-replace it
18.) After the top cover and end walls have been removed, what is the next logical step in the disassembly process?
-QRP and purlins
19.) The end-panel contour ropes should be tied off to the ___ cleat
-green
20.) The long section of the plenum is attached with the hook and loop straps to the____.
-center purlin
21.) Three yellow color-coded purlins are installed at the ____ end of the purlins.
-opposite
22.) How should the non-slip floor be folded for packing?
-In an accordion style
23.) The male connector is used to connect to ___.
- the incoming power
24.) Inventory the SSS for missing parts using the ___ contained in the Technical Order.
-inventory list
25.) The SSS overhead lights are strung along the side purlins and attached with ____
-hook and loop strips
26.) The internal electrical distribution box _____.
-controls power to the shelter lights and receptacles
27.) After the top cover, end walls, purlins and uprights have been removed, what is the next logical step in the disassembly process?
-Arches
28.) One complete arch consists of one red color coded arch and___.
- three arch pieces
29.) When the contour rope is tight, the top cover should overlap the end panel by ______
-four to five inches
30.) Receptacle power is protected by the use of______.
- A 20 amp, ground fault circuit interrupting breaker
31.) If you have difficulty placing the first leg of the arch, have your partner _____ the arch.
-raise his/her side
32.) The base assembly is secured to the ground using ______.
- double headed spikes
33.) Folding the top cover requires at least _____.
-four people
34.) At what point should the hooking tool be used on the end panels?
- After all ropes are attached and tightened.
35.) What should be removed before removing the top cover?
-Remove guy ropes
36.) The supply and return air ducts are secured to the ECU by_____.
-a screw type clamp.
37.) Guy ropes must be used when ____.
- winds are expected above 40 mph
38.) What ties the end-panel uprights with the hard door end panel?
-Door header
39.) If the floor cutouts do not line up with the appropriate base stub ______.
- the base is not correctly aligned
40.) A 20-amp light switch is located on the ____ of the distribution box.
-side
41.) Connect the yellow light string to the _____ connector at the distribution box.
-switched
42.) Attach the floor to the top cover and the end walls by matching the ______.
-hook and loop strips
43.) The receptacle lines are connected to the female connector
-True
44.) Where are the ducts for the ECU stored?
- compartment in the top of the ECU
45.) Start the liner installation with the ____ side up.
-silver
46.) The spare parts kit contains vital replacement parts to repair the SSS during a deployment situation.
-True
47.) Once assembled the SSS has ____ total arches.
-six
48.) How should the top cover be folded for packing?
-In an accordion style
49.) After the components are inspected, they should be laid out in the order they will be used, during tent erection.
-T
50.) Leaving a droop in the center of the overhead liner allows ____ across the top of the structure.
-ventilation.
51.) The ____ is the largest and heaviest piece in the kit.
- top cover
52.) There are ____ guy ropes used to securely anchor the top cover to the ground.
-twelve
53.) what tool is used to remove the double-headed spikes from the ground?
-Hook tool
54.) Position the ECU in front of the shelter duct openings, about ___ from the end wall.
- 3 feet
55.) Typically, the zippered door will be used for the main entrance.
-true
56.) The 45-degree angle plenum section is connected to the ___ air duct
-ventilation
57.) Ensure that you use safety shoes, leather gloves, hard hat and ____ during the base assembly process.
-eye protection